SASKPOWER CARBAMATE
CARBON CAPTURE PROJECT

SCOPE OF WORK

Mechanical Installations, Fabrication, Safety Services, Quality Supervision

PROJECT MANAGERS

Dennis McDonald

  • LOCATION Estevan, Sask

  • COMPLETION DATE 2013

  • CLIENT Sask Power

OVERVIEW

Carbon capture pipe and steel supports for the Carbon Capture project in Estevan, Saskatchewan. Carbon Capture project consisted of re-powering of the existing Unit #3 and the installation of the Carbon Dioxide, Sulfur Dioxide and NOx capture facility. Its primary purpose is to provide a low-cost source of carbon dioxide. DMS successfully completed the Piping and supports related to the Carbon Capture process and its 65,000 sq. ft. facility

PROJECT DETAILS

The scope of work that DMS undertook for this project included the supply, fabrication, and installation of piping supports installation of prefabricated piping spools, NDE inspection, and Hydrotesting.

When the piping installation scope was in the proposal stage, the design was not complete and the overall scope was unclear. This work was completed during the overall construction of the building on site and prefabricated piping spools were craned in. DMS had a sub contractor fabricate the piping supports. While on site, DMS installed the piping spools and supports followed by Hydro testing to ensure quality compliance.

Install of pre-fabricated piping, pressure testing, supply/install pipe supports including paint, safety and quality supervision.

See below for a SaskPower project overview video: